Flow-Down Insurance Requirements, Checked on Every Sub's COI
Hold every sub to your company's floor, then put the owner's stricter limits and endorsements on the job that carries them. When a sub is short, you know which job, which coverage and by how much — before mobilization, not at the owner's audit.
Company floor on every plan · job-level rules on Pro, 30-day free trial
Compliance rules
Ridgeline Construction Group
Company floor — every sub
- General liability $1,000,000
- Workers' compensation Required
- Auto liability $1,000,000
Job: St. Mary's Hospital — West Wing
- General liability raised $2,000,000
- Umbrella added $5,000,000
Why? St. Mary's Hospital — West Wing: No Umbrella coverage on any certificate — required on this job
From the subcontract exhibit to a checked COI
Your requirements already exist — in the insurance exhibit of your standard subcontract, and in the prime contract for each job. Enter them once, and every certificate a sub sends is measured against them.
Set the company floor
The GL, workers' comp, auto and umbrella minimums from your standard subcontract. Every sub on the roster is held to them, on every plan. Keep it to what you would actually refuse to let on site without — anything above that belongs on the job.
Apply the GC preset
One click fills your required documents with what GCs and roofers usually collect: W-9, COI, state trade license, MSA, safety plan or EMR letter, additional insured endorsement, workers' comp exemption. Untick what you do not enforce. Starter and up.
Flow the owner's requirements down onto the job
When the prime contract is signed, create the job and set its minimums and document list from the owner's insurance exhibit. The job starts with a copy of your document list, so you only add what the owner asks for. Assign the subs you bid it with, and anyone short shows up on the job's page and on their own badge. Pro.
Call them Jobs, Projects or Sites — the label is yours, on the Appearance tab in Settings, and so is calling them Subcontractors.
Where the owner's requirements differ from yours
A sub cleared for a tenant fit-out is not automatically cleared for the hospital wing. These are the flow-downs that catch GCs out, and where each one goes.
Higher limits on the institutional job
The hospital, the school district or the developer's lender wants $2M per occurrence and a $5M umbrella where your standard subcontract asks for $1M. Raise it on that job; the rest of the roster keeps your floor.
Additional insured, ongoing and completed operations
An owner who asks for CG 20 10 and CG 20 37 naming them and the GC. Require the additional insured endorsement on the job, and the sub's upload link asks for the endorsement page rather than a certificate with a name typed in the holder box. CG 20 10 vs CG 20 37, explained.
Primary & non-contributory, waiver of subrogation
Common in commercial prime contracts and rarely in a residential remodel. Add them to the job's document list — not your company list — so they are only chased where the contract calls for them.
The owner's own paperwork
A site-specific safety orientation sign-off, a badge request form, the owner's own vendor packet. On Pro, add it as your own document type with the blank form attached for the sub to download.
What those numbers typically are, by state and by trade, is covered in our guide to general contractor insurance requirements.
The GC preset, and how each document is checked
Each requirement is answered by what is already on the sub's page. A COI uploaded for one job counts for every job it meets the limits of — nobody asks the same sub for the same paper twice.
Form W-9
Legal name, TIN and tax classification read off the form. Needed before the first pay app is paid.
Certificate of insurance
Carrier, limits and each coverage's dates read off the ACORD 25 and checked against your floor and the job's minimums.
State trade license
Met by a linked license that has not expired — checked against the state board where it publishes its licenses.
Master subcontractor agreement
The signed MSA, uploaded and tagged. No expiry, so it is asked for once.
Safety plan / EMR letter
The written safety program or the carrier's experience modification rate letter, with an expiry date so a stale EMR shows up.
Additional insured endorsement
Read off the endorsement pages on Pro — the form number and who is named. On any plan, an upload tagged as the endorsement counts.
Workers' comp exemption
For the sole proprietor without employees — the state exemption certificate, with its expiry.
An upload counts toward the requirement the moment it arrives — there is no approval queue. Lien waivers, lead-safe (RRP) and asbestos certifications are in the library too.
The sub gets one link that asks for exactly what is missing
Most subs do not know your requirements changed on the new job — they sent you a COI in March and consider it done. Their upload link lists every document still owed across your company list and their jobs' lists, with your description and any blank form beside each item, and marks what is already on file. No login, no portal, from a phone in under two minutes.
When the renewal arrives with the umbrella their agent added, the badge turns green the same day. On Starter and up, the 90/60/30/7-day alerts chase the certificate before it lapses, so the job's requirement does not quietly expire mid-job.
Custom compliance rules in other industries
Property managers
Management-company defaults for every vendor, and each owner's insurance requirements on their own property.
HOA & community associations
Each association's board-approved vendor requirements, and a higher bar for the roof or the pool contract.
Private schools
Minimums for vendors on campus, and facility use requirements set per rental.
The rules apply to each job you set up — how that grouping works, with its dates and its own report: tracking by job.
How the rules work across every industry — defaults, document presets, per-project overrides and waivers: custom compliance rules.
Simple, transparent pricing
Your company floor is free for up to 25 subs. The GC preset and required documents start on Starter; job-level requirements come with Pro.
Free
Free forever. No credit card. No expiration date on the free tier.
- ✓AI COI parsing and AI W-9 parsing — carrier, limits, policy dates, name, TIN and tax classification read for you
- ✓Any other document, filed by category — contracts, financials, licensing, insurance
- ✓License tracking in all 50 states, plus automated daily state-database verification
- ✓Magic link uploads — your subs send documents without an account
- ✓Expiration tracking across every license, certificate and W-9
- ✓Weekly compliance digest by email
- ✓Timestamped audit trail
Starter
Solo GC or property manager tired of chasing renewals manually — less than the cost of discovering one expired license on inspection day.
- ✓Everything in Free
- ✓Unlimited subcontractors — no 25-record ceiling
- ✓Automated email alerts at 90/60/30/7 days — sent to your team and the contractor
- ✓Calendar feed — subscribe every deadline into Google Calendar, Outlook or Apple Calendar
- ✓Bulk import — add your roster from CSV or a certificate archive
- ✓Invite a second user to your account
Pro
Multiple job sites or properties, with a foreman or office manager who also needs access.
- ✓Everything in Starter
- ✓AI-parsed endorsements — additional insured, waiver of subrogation, primary & non-contributory, read off the endorsement pages
- ✓Projects — group subs by job or property, with per-project coverage requirements
- ✓Unlimited users & team roles
- ✓Integrations — QuickBooks Online, Zapier, Make, Slack and Teams
- ✓Compliance reports (PDF & Excel)
No contracts. Cancel anytime. See the full plan comparison →
Frequently asked questions
How do I flow down the owner's insurance requirements to my subs?
Does the sub see which job the requirement is for?
A sub is a sole proprietor with no employees. Do they have to show workers' comp?
Can you check a per-project aggregate endorsement (CG 25 03)?
What happens when the job is finished?
Which plan do GCs need for this?
Know which subs meet the owner's requirements before mobilization
Your floor for every sub, the owner's flow-downs on the job, and every COI checked as it arrives.
Start free — no credit cardNo credit card required
Explore More
General Contractor Compliance Software
Subcontractor compliance software for GCs — licenses, COIs & W-9s
Custom Compliance Rules
Default insurance minimums, required documents and per-project overrides
Project Management
Group vendors by project or job
Certificate Holder vs. Additional Insured
The endorsement distinction that decides who's protected in a claim
Subcontractor Onboarding Checklist
10 documents every GC needs from new subs before work starts
License Verification
Search 1M+ licenses and monitor your sub roster daily
Compliance Software for Small GCs
Why enterprise tools are overkill and what to use instead
AI COI Parsing
AI-powered certificate of insurance extraction
Plans & Pricing
View plans and start your free trial